ZIRO, May 9: The Lower Subansiri administration carried out an eviction after ground verification of the construction of Trans Arunachal Highway of the Package II in Tajgi area.
Verification was carried out on 30 April, by Deputy Commissioner Somcha Lowang following which the eviction drive was conducted on May 8 in the the stretches of the TAH between the chainage from 73:00 to 75:00 to facilitate the smooth construction of the highway.
Four structures falling under the RoW were demolished on Saturday. When repeated directions for demolition was unheard by the owners inspite of receiving the compensation amounts,the eviction had to be carried out.
The DC directed the beneficiaries who are yet to remove the structures along the RoW to remove the encumbrances as notified by the District Administration immediately failing which the same will be evicted within the next week.
The eviction drive was led by DC Lowang and joined by SP Ziro, DLRSO, AE Highway and AE UD. DIPRO