9th May 2021 10:05:PM State
Eastern Sentinel Arunachal News

ZIRO, May 9: The Lower Subansiri administration carried out an eviction after ground verification of the construction of Trans Arunachal Highway of the Package II in Tajgi area.
Verification was carried out on 30 April,  by  Deputy Commissioner  Somcha Lowang following which the eviction drive was conducted on May 8 in the the stretches of the TAH between the chainage from 73:00 to 75:00  to facilitate the smooth construction of the highway. 
Four structures falling under the RoW   were demolished  on Saturday. When repeated directions for demolition was unheard by  the owners inspite of receiving the compensation amounts,the eviction had to be carried out.
 The DC directed the beneficiaries who are yet to remove the structures  along the RoW to remove the encumbrances as notified by the District Administration immediately failing which the same will be evicted within the next week. 
The eviction drive was led by DC Lowang and joined by SP Ziro, DLRSO, AE Highway and AE UD. DIPRO

 


Kenter Joya Riba

(Managing Editor)
      She is a graduate in Science with post graduation in Sociology from University of Pune. She has been in the media industry for nearly a decade. Before turning to print business, she has been associated with radio and television.
Email: kenterjoyaz@easternsentinel.in / editoreasternsentinel@gmail.com
Phone: 0360-2212313

<< Back to News List