10th Nov 2018 10:11:PM State
Eastern Sentinel Arunachal News

ES Reporter 
 
ITANAGAR, Nov 10:  Pare Project Downstream Welfare Committee" (PPDWC),  representing all the land affected owners and villagers of Rose, Chiputa, Manni, Lekha and Midpu,  served a 15-day  ultimatum to  the Chief Secretary and Head of the NEEPCO for early intervention on  its demands failing which the committee has threatened to call for democratic agitation.
Addressing a  press conference, Chairman, PPDWC, Yab Tra Camdir informed that due to huge discharge of  water from the Pare project,  villagers are facing untold  problems  which need to be pondered upon on an urgent basis.
“We demand the authority to take necessary steps  for the protection of WRC  and  plantation land at vulnerable areas  since from the construction of the Pare Hydro Electrical Project large quantity of water is being discharged due to which agriculture, horticulture and plantation land  of  above mentioned villages  get inundated on a daily basis.
The Committee has also sought protection of the wire rope suspension bridge in different locations of downstream areas. ‘ Due to discharge of huge and excessive river water from the  dam and also due to rising in velocity of water current now the present bridges are in danger of collapse, which need immediate attention’, added the Chairman.


Kenter Joya Riba

(Managing Editor)
      She is a graduate in Science with post graduation in Sociology from University of Pune. She has been in the media industry for nearly a decade. Before turning to print business, she has been associated with radio and television.
Email: kenterjoyaz@easternsentinel.in / editoreasternsentinel@gmail.com
Phone: 0360-2212313

<< Back to News List